Over the last two weeks I worked on the next, probably last before… - Alex Belits
abelits
abelits
Over the last two weeks I worked on the next, probably last before production, iteration of changes to Trogdor. Cooling systems are now stamped instead of milled, so they are lighter and cheaper to produce.

I have re-done almost all 3d drawings in Varicad, power supply parts and air ducts are now simplified, and all inconsistencies in them resolved. The fan bracket in the power supply, that always didn't quite fit, was placed into the assembly drawing, and it didn't fit there either, so I had to change (not to mention simplify quite a bit) its geometry.